An analysis of the causes and consequences of the information gap in IT projects. The client’s and the supplier’s perspective in Poland

Authors

DOI:

https://doi.org/10.5604/01.3001.0015.6932

Keywords:

information gap, IT project, ERP, CRM

Abstract

The high IT project failure rate means that the stakeholders start recognizing the need to analyze the factors influencing project success, previously deemed irrelevant in the face of technology, including the agile approach, eliminating project documentation, effective prototyping, information asymmetry between project parties, while also perfecting communication and the methods of knowledge transfer between team members. Currently, IT projects are researched using a holistic approach, seeing an implementation project as a whole, subject to specific regularities, which may not be deduced based on the knowledge of their individual components. We would like to enrich the research perspective with the notion of the information gap. The article aims to evaluate and analyze the information gap in ERP and CRM project implementations. We have researched the information gap from the perspective of project managers on the supplier’s and the client’s sides. The study was conducted in Poland between 2014 and 2021 in a group of medium companies, using qualitative research methods: unstructured interview and direct observation. The study led to a qualitative characterization of the information gap and the identification of its causes and consequences. The presented research result can help achieve three goals, i.e. studying the information gap in the selected group of IT projects, indicating the nature of imperfection in information access by the project participants, and raising awareness amongst project managers regarding risk management issues, especially uncertainty. Reducing the information gap can be used by the transaction parties to implement a strategy of building the object’s resilience to uncertainty and its consequences. These results can help develop methodologies of IT project implementation, limiting the level of risk and uncertainty.

References

Adams, V. M., Pressey, R. L. (2011). An infogap model to examine the robustness of costefficient budget allocations. In Vulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management (pp. 971-979).

Akerlof, G. A., & Shiller, R. J. (2010). Animal spirits: How human psychology drives the economy, and why it matters for global capitalism. Princeton university press.

Ambroziak, T., Jachimowski, R., Pryciński, P. (2015). Wybrane zagadnienia planowania transportu w warunkach niepewności. Logistyka, (4), 2248-2255.

Amoako-Gyampah, K., & Salam, A. F. (2004). An extension of the technology acceptance model in an ERP implementation environment. Information & management, 41(6), 731-745.

Asquin, A., Garel, G., & Picq, T. (2010). When project-based management causes distress at work. International Journal of Project Management, 28(2), 166-172.

Auksztol, J. (2008). IT Outsourcing in Management, Theory and Practice (Outsourcing Informatyczny w Teorii i Praktyce Zarządzania).

Babik, W. (2000). Zarządzanie informacją we współczesnych systemach informacyjno-wyszukiwawczych: nowe wyzwanie współczesności. Zagadnienia informacji naukowej, (1 (75)).

Babik, W. (2014). Ekologia informacji. Kraków: Wydawnictwo Uniwersytetu Jagiellońskiego.

Bannister, F., Remenyi, D. (2000). Acts of faith: instinct, value, and IT investment decisions. Journal of Information Technology, 15(3), 231-241.

Bannister, F., Remenyi, D. (2004). Value Perception in IT Investment Decisions http://www. ejise. com/volume-2/volume2-issue2/issue2-art1.htm edn. In Nr Reading, England: Academic Conferences Limited.

Ben-Haim, Y. (2006). Info-gap decision theory: decisions under severe uncertainty. Elsevier.

Ben-Haim, Y. (2018). What Strategic Planners Need to Know.

Bradley, K. (2004). Podstawy metodyki PRINCE2®. Centrum Rozwiązań Menedżerskich.

Carvalho, M. M. (2008). Communication is-sues in projects management. In PICMET'08-2008 Portland International Conference on Management of Engineering & Technology (pp. 1280-1284). IEEE.

Chang, S. I. (2004). ERP life cycle implementation, management and support: implications for practice and research. In 37th Annual Hawaii International Conference on System Sciences, 2004. Proceedings of the (pp. 10-pp). IEEE.

Ciesielska, M., Boström, W. K., Öhlander, M. (2012). Obserwacja,[in:] Badania jakościowe. Metody i narzędzia. V. 2 (Doctoral dissertation, ed. D. Jemielniak, Wydawnictwo PWN, Warsaw).

Davidovitch, L., Ben-Haim, Y. (2011). Robust Resource Allocation: An Info-Gap Approach. In Vulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management (pp. 988-995).

Dioguardi, G. (2010). The Complex Nature of the Network Enterprise. In Network Enterprises (pp. 13-24). Springer, New York, NY.

Doroszewski, W. (2012). Słownik języka polskiego [Polish language dictionary]. Warszawa: PWN.

Edwards, W. (1982). Conservatism in human information processing (excerpted). Judgment under Uncertainty: Heuristics and Biases, Cambridge University Press, New York, NY.

Esteves, J., Bohorquez, V. (2007). An updated ERP systems annotated bibliography: 2001-2005. Communications of the Association for Information Systems, 19(1), 18.

Esteves, J., Pastor, J. A. (2006). Organizational and technological critical success factors behavior along the ERP implementation phases. In Enterprise information systems VI (pp. 63-71). Springer, Dordrecht.

Flasiński, M. (2006). Zarządzanie projektami informatycznymi. Warszawa: Wydawnictwo Naukowe PWN.

Harmon, P., & Trends, B. P. (2010). Business process change: A guide for business managers and BPM and Six Sigma professionals. Elsevier.

Hernik, J. (2013). Informacja czy manipulacja? Analiza na przykładzie wybranych reklam. Acta Universitatis Nicolai Copernici. Zarządzanie, 40, 193-204.

ITIL (2021), website: www.itlibrary.org.

Jachimowski, R., Szczepański, E., Kłodawski, M., Markowska, K., & Dąbrowski, J. (2018). Selection of a container storage strategy at the rail-road intermodal terminal as a function of minimization of the energy expenditure of transshipment devices and CO2 Emissions. Rocznik Ochrona Środowiska, 20, 965-988.

Jacyna-Gołda, I., Izdebski, M., & Szczepański, E. (2016, March). Assessment of the method effectiveness for choosing the location of ware-houses in the supply network. In International Conference on Transport Systems Telematics (pp. 84-97). Springer, Cham.

Jacyna-Gołda, I., Lewczuk, K., Szczepański, E., & Murawski, J. (2015, April). Computer Aided Implementation of Logistics Processes–Selected Aspects. In International Conference on Transport Systems Telematics (pp. 67-80). Springer, Cham.

Johnson, J. (2018). CHAOS report: decision latency theory: it is all about the interval. Lulu. com.

Joshi, K., Pant, S. (2008). Development of a framework to assess and guide IT investments: An analysis based on a discretionary–mandatory classification. International Journal of Information Management, 28(3), 181-193.

Kahneman, D. (1979). Prospect theory: An analysis of decisions under risk. Econometrica, 47, 278.

Kisielnicki, J. (2016). Zarządzanie projektami badawczo-rozwojowymi–system komunikacji. Prace Naukowe Uniwersytetu Ekonomicznego we Wrocławiu, (421), 239-254.

Kohlegger, M., Maier, R., & Thalmann, S. (2009). Understanding maturity models. Results of a structured content analysis (pp. 51-61).

Kuhlthau, C. C. (1991). Inside the search process: Information seeking from the user's perspective. Journal of the American Society for information science, 42(5), 361-371.

Kuhlthau, C. C. (2005). Information search process. Hong Kong, China, 7, 226.

Łobejko, S. (2011). Wykorzystanie kosztów transakcyjnych jako czynnika rozwoju przedsiębiorstw sieciowych, w: R. Sobiecki, JW Pietrewicz (red.). Koszty transakcyjne - skutki zmian dla przedsiębiorstw.

Malewska, K. (2014). Ewolucja modeli procesów podejmowania decyzji. Marketing i Rynek, 5, 127-135.

March, J. G., & Simon, H. A. (1993). Organizations. John Wiley & sons.

Marchau, V. A., Walker, W. E., Bloemen, P. J., & Popper, S. W. (2019). Decision making under deep uncertainty: from theory to practice (p. 405). Springer Nature.

Materska, K. (2007). Informacja w organizacjach społeczeństwa wiedzy. Wydawnictwo SBP-Stowarzyszenia Bibliotekarzy Polskich.

Microsoft (2021), website: www.microsoft.com.

Moorhead, G., & Griffin, R. W. (2008). Organizational behavior managing people and organizations. Dreamtech Press.

Müller, R. (2003). Determinants for external communications of IT project managers. International Journal of Project Management, 21(5), 345-354.

Nguyen, T. H., Sherif, J. S., & Newby, M. (2007). Strategies for successful CRM implementation. Information Management & Computer Security.

North, D. C. (1991). Institutions. Journal of economic perspectives, 5(1), 97-112.

Oleński, J. (2003). Ekonomika informacji: metody. Polskie Wydawnictwo Ekonomiczne.

PMI. SAP (2021), website: www.sap.com.

PRINCE 2 Best Management Practice (2021), website: www.best-management-practice.com.

Rudyk, T., Szczepański, E., & Jacyna, M. (2019). Safety factor in the sustainable fleet management model. Archives of Transport, 49(1), 103-114.

SAP (2021), website: www.sap.com.

SCONUL (2021), website: www.sconul.ac.uk.

Selby, R. W. (2007). Software engineering: Barry W. Boehm's lifetime contributions to software development, management, and research (Vol. 69). John Wiley & Sons.

Sentz, K., Hemez, F. M. (2013, July). Information gap analysis for decision support systems in evidence-based medicine. In International Workshop on Machine Learning and Data Mining in Pattern Recognition (pp. 543-554). Springer, Berlin, Heidelberg.

Shaul, L., Tauber, D. (2013). Critical success factors in enterprise resource planning systems: Review of the last decade. ACM Computing Surveys (CSUR), 45(4), 1-39.

Szczepański, E., Żak, J., Jacyna-Gołda, I., & Murawski, J. (2017). Simulation support of freight delivery schedule in urban areas. Procedia Engineering, 187, 520-525.

The Big6 (2021), website: www.big6.com.

Wachnik, B. (2013, October). Knowledge transfer in management support system implementation. In International Conference on Information and Software Technologies (pp. 46-56). Springer, Berlin, Heidelberg.

Wachnik, B. (2015). An Analysis of Effectiveness Factors in the Completion of it Projects–the supplier’s Perspective. Studia Ekonomiczne, 234, 164-183.

Wachnik, B. (2017). Analiza projektów informatycznych z wykorzystaniem współczesnych teorii działania przedsiębiorstw. Zeszyty Naukowe. Organizacja i Zarządzanie/Politechnika Śląska.

Wachnik, B. (2017). Critical Success Factors in IT Projects-From the Practice of Polish Clients. In FedCSIS (Communication Papers) (pp. 27-33).

Wachnik, B., Głodziński, E. (2021). Komponenty informacyjne zmniejszające lukę informacyjną w informatycznych przedsięwzięciach wdrożeniowych. Przegląd Organizacji, (3), 20-30.

Walker, W. E., Marchau, V. A., & Swanson, D. (2010). Addressing deep uncertainty using adaptive policies: Introduction to section 2. Technological forecasting and social change, 77(6), 917-923.

West, J. L. (1997). Building a High-Performing project Team, Field Guide to Project Management, red. DL Cleland, Yan Nostmd Reinhold, New York.

Zhang, J. (2011, June). Newsboy problem under Knightian uncertainty. In ICSSSM11 (pp. 1-5). IEEE.

Downloads

Published

2021-12-31

Issue

Section

Original articles

How to Cite

Wachnik, B., Pryciński, P., Murawski, J., & Nader, M. (2021). An analysis of the causes and consequences of the information gap in IT projects. The client’s and the supplier’s perspective in Poland. Archives of Transport, 60(4), 219-244. https://doi.org/10.5604/01.3001.0015.6932

Share

Similar Articles

31-40 of 121

You may also start an advanced similarity search for this article.

No Related Submission Found