[1]
L. Wang, L. Yuwen, and C. Xiaoxin, “Research on the road linear optimization design of bridge and tunnel connecting segment in the canyon”, AoT, vol. 52, no. 4, pp. 67–79, Dec. 2019, doi: 10.5604/01.3001.0014.0209.