Wachnik, B., Pryciński, P., Murawski, J., & Nader, M. (2021). An analysis of the causes and consequences of the information gap in IT projects. The client’s and the supplier’s perspective in Poland. Archives of Transport, 60(4), 219-244. https://doi.org/10.5604/01.3001.0015.6932