[1]
Sawicki, P. and Sawicka, H. 2021. Combined optimisation and MCDA based solution of the tram depot location problem. Archives of Transport. 60, 4 (Dec. 2021), 88–103. DOI:https://doi.org/10.5604/01.3001.0015.5970.