[1]
Kasraei , A. and Zakeri, J.A. 2020. Effective time interval for railway track geometry inspection. Archives of Transport. 53, 1 (Mar. 2020), 53–65. DOI:https://doi.org/10.5604/01.3001.0014.1744.